{"id":351,"date":"2026-11-20T23:44:17","date_gmt":"2026-11-20T23:44:17","guid":{"rendered":"https:\/\/pasalavoz.net\/?p=351"},"modified":"2026-11-20T23:44:18","modified_gmt":"2026-11-20T23:44:18","slug":"centros-de-datos-peru-acuerdo-eeuu-agua","status":"publish","type":"post","link":"https:\/\/pasalavoz.net\/en\/centros-de-datos-peru-acuerdo-eeuu-agua\/","title":{"rendered":"Data centres in Peru: what the US signed, and the water question"},"content":{"rendered":"<p class=\"wp-block-paragraph\"><strong>On 8 September 2026, Peru and the United States signed a memorandum of understanding on artificial intelligence in Lima. The text covers cloud computing, data centres and US vendors, but it is not a treaty and not a licence to install those facilities: they were already operating in the country. The document does not name China, and it does not put a figure on cost savings. What remains open, and is documented in the United States, Chile and Uruguay, is the water this infrastructure can require, especially in desert Lima. This article separates what the agreement says, what officials said and what the figures show.<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><em>Published on 20 November 2026. Nothing that follows is a rumour: every fact points to an official source or a serious outlet, and we say when a reading comes from the press, not from the signed text.<\/em><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">The essentials<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>What was signed:<\/strong> a three-year memorandum of understanding on artificial intelligence, on 8 September 2026 in Lima, between Prime Minister Luis Galarreta and US Ambassador Bernie Navarro (<a href=\"https:\/\/www.gob.pe\/institucion\/pcm\/noticias\/1441161-pcm-y-embajada-de-los-estados-unidos-suscriben-memorando-de-entendimiento-para-impulsar-desarrollo-la-ia-en-el-peru\">PCM<\/a>, <a href=\"https:\/\/pe.usembassy.gov\/es\/embajador-navarro-lidero-cumbre-de-inteligencia-artificial-para-impulsar-el-futuro-digital-del-peru\/\">US Embassy<\/a>).<\/li>\n\n\n<li><strong>Qu\u00e9 dice:<\/strong> cooperaci\u00f3n en reglas, nube, centros de datos, redes 5G, ciberseguridad, formaci\u00f3n y facilitaci\u00f3n de negocios con proveedores estadounidenses de IA. Seg\u00fan fragmentos citados por <a href=\"https:\/\/www.swissinfo.ch\/spa\/per%C3%BA-firma-memorando-para-importar-y-adoptar-ia-de-ee.uu.-frente-a-otros-pa%C3%ADses-como-china\/92032754\">EFE<\/a>, el Per\u00fa se compromete a \u00abimportar y adoptar tecnolog\u00eda de EE.UU.\u00bb.<\/li>\n\n\n<li><strong>Qu\u00e9 no es:<\/strong> no es un tratado ni una concesi\u00f3n para \u00abpermitir\u00bb centros de datos estadounidenses. Esas instalaciones ya eran legales y ya operaban en el Per\u00fa. Ninguna gran tecnol\u00f3gica de EE. UU. ha anunciado un campus propio ligado a este acuerdo.<\/li>\n\n\n<li><strong>China y los costos:<\/strong> el texto oficial no nombra a China ni da una cifra de ahorro. Navarro advirti\u00f3 sobre \u00abproveedores extrahemisf\u00e9ricos\u00bb; EFE interpret\u00f3 esa frase como una alusi\u00f3n a China.<\/li>\n\n\n<li><strong>El agua:<\/strong> el memorando no la menciona. En EE. UU., un informe de 2024 del Lawrence Berkeley National Laboratory estim\u00f3 66.000 millones de litros de uso directo en 2023. En Lima, la Defensor\u00eda advirti\u00f3 en julio de 2026 que el sector carece de reglas ambientales propias.<\/li>\n\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">Lo que se firm\u00f3, y lo que no es<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">La firma se hizo en la apertura del 2026 AI Summit, un foro en Lima organizado por la Embajada de Estados Unidos y la Universidad Cient\u00edfica del Sur, un d\u00eda antes de la visita del secretario de Estado Marco Rubio. No ocurri\u00f3 en una cumbre del APEC ni durante la visita del papa. Los firmantes fueron Galarreta, presidente del Consejo de Ministros, y Navarro. El acuerdo lo suscribieron la Embajada y la PCM, no el Congreso peruano ni un tratado entre canciller\u00edas.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Seg\u00fan el comunicado de la PCM, las partes \u00abformalizan la intenci\u00f3n\u00bb de promover tecnolog\u00eda \u00absegura, confiable e interoperable\u00bb. La cooperaci\u00f3n cubre regulaci\u00f3n y gobernanza, \u00abpara establecer marcos normativos amigables para los negocios\u00bb, servicios p\u00fablicos digitales y protecci\u00f3n de datos; y tecnolog\u00eda e infraestructura, para \u00abconstruir redes seguras, como computaci\u00f3n en la nube, centros de datos y suministros de 5G\u00bb. Tambi\u00e9n incluye ciberseguridad, formaci\u00f3n y \u00abpromover la participaci\u00f3n comercial entre proveedores de tecnolog\u00eda de IA de los Estados Unidos y socios de los sectores p\u00fablico y privado en Per\u00fa\u00bb. El acuerdo dura tres a\u00f1os. El punto de contacto peruano es la Secretar\u00eda de Gobierno y Transformaci\u00f3n Digital de la PCM.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">EFE cit\u00f3 adem\u00e1s estos fragmentos del documento: el Per\u00fa se compromete a \u00abimportar y adoptar tecnolog\u00eda de EE.UU.\u00bb, y ambas partes, a \u00abconstruir infraestructura digital segura, incluyendo computaci\u00f3n en la nube, centros de datos, redes de pr\u00f3xima generaci\u00f3n y cadenas de suministro 5G\u00bb. En noviembre, <a href=\"https:\/\/ojo-publico.com\/6578\/memorandum-ia-eeuu-busca-construir-mas-centros-datos-peru\">OjoP\u00fablico<\/a> inform\u00f3 que hab\u00eda accedido al texto, que el Gobierno no hab\u00eda publicado \u00edntegro, y subray\u00f3 el objetivo de facilitar negocios de proveedores estadounidenses de IA.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">En los comunicados oficiales no hay una cl\u00e1usula que autorice, ubique o \u00abpermita\u00bb centros de datos de EE. UU. en territorio peruano. Tampoco se mencionan el agua, el suministro el\u00e9ctrico, los chips, el control de exportaciones ni un proyecto de una empresa concreta. AWS opera una Local Zone en Lima desde enero de 2023, un punto de baja latencia, no una regi\u00f3n completa de nube; esa inversi\u00f3n es anterior al memorando.<\/p>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>Explicado f\u00e1cil: qu\u00e9 es un memorando de entendimiento<\/summary>\n<p class=\"wp-block-paragraph\">Un memorando de entendimiento, o MdE, es un documento en el que dos gobiernos o instituciones dejan por escrito su intenci\u00f3n de cooperar. Suele fijar temas, plazos y responsables, pero no tiene la fuerza de una ley ni de un tratado. La PCM present\u00f3 este acuerdo como una formalizaci\u00f3n de intenciones, con tres a\u00f1os de vigencia. Otro memorando Per\u00fa-EE. UU., el de minerales cr\u00edticos de febrero de 2026, s\u00ed dice de forma expresa que \u00abno crea obligaciones jur\u00eddicamente vinculantes\u00bb. El de IA no se public\u00f3 \u00edntegro en gob.pe al firmarse.<\/p>\n\n<\/details>\n\n\n\n<h2 class=\"wp-block-heading\">China: lo que se dijo, y lo que no est\u00e1 en el texto<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">El comunicado de la PCM no menciona a China. En el acto, seg\u00fan la Embajada, Navarro pidi\u00f3 al Per\u00fa ser \u00abaudaz\u00bb y \u00abelegir sabiamente\u00bb, porque \u00ablos socios y la tecnolog\u00eda que elijan hoy definir\u00e1n su futuro digital durante muchos a\u00f1os\u00bb. EFE, el mismo d\u00eda, lo cit\u00f3 advirtiendo que \u00abla IA desarrollada y controlada por proveedores extrahemisf\u00e9ricos representa una amenaza para la seguridad nacional\u00bb, y a\u00f1adi\u00f3, entre par\u00e9ntesis, que esa frase era una referencia a China. Esa lectura es de la agencia, no una menci\u00f3n a China en el comunicado oficial.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Al d\u00eda siguiente lleg\u00f3 Rubio. El 8 de septiembre hab\u00eda publicado una <a href=\"https:\/\/elcomercio.pe\/opinion\/columnistas\/un-hemisferio-que-cumple-por-marco-rubio-noticia\/\">columna en El Comercio<\/a> en la que escribi\u00f3 que, \u00abdurante demasiado tiempo, actores ajenos al hemisferio respaldados por Estados extranjeros, espec\u00edficamente de China, han ingresado a nuestra regi\u00f3n\u00bb, y que el control extranjero de activos cr\u00edticos amenaza la soberan\u00eda, \u00abla privacidad de los datos y la independencia econ\u00f3mica\u00bb. EFE y Emol situaron esas cr\u00edticas en el litigio de Cosco, due\u00f1a del puerto de Chancay, con el Estado peruano por las tarifas, y citaron a Rubio diciendo que proyectos \u00abrespaldados por el Partido Comunista Chino pasan por alto los marcos legales del Per\u00fa y amenazan la transparencia y la seguridad de los datos\u00bb. La Embajada de China en Lima respondi\u00f3 que sus inversiones son \u00abtransparentes y conforme a la ley\u00bb. Ese intercambio es el contexto de la visita, no una cl\u00e1usula del memorando de IA, que no menciona Chancay.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">D\u00f3nde se instalan los centros de datos, y qu\u00e9 se sabe de los costos<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Las empresas no eligen un pa\u00eds solo por un memorando. La Agencia Internacional de la Energ\u00eda, en su informe <a href=\"https:\/\/www.iea.org\/reports\/powering-artificial-intelligence\">Powering Artificial Intelligence<\/a> (14 de octubre de 2026), resume los factores habituales: disponibilidad de terreno, acceso a redes de fibra, cercan\u00eda a los clientes, incentivos fiscales, permisos, disponibilidad de electricidad y de agua, y la estrategia comercial. La latencia, el retraso en transmitir datos, importa m\u00e1s para servicios en la nube orientados al usuario; el entrenamiento masivo de IA puede, en muchos casos, instalarse m\u00e1s lejos. Estos son criterios generales de la industria, no las razones oficiales de este acuerdo.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Ni el memorando ni las declaraciones oficiales de Galarreta o Navarro cuantifican un ahorro de costos para planes estadounidenses en el Per\u00fa. No se encontr\u00f3 tampoco un estudio serio que calcule ese ahorro para este acuerdo. Lo que s\u00ed hay son cifras p\u00fablicas sobre electricidad y construcci\u00f3n, con alcances distintos, que no deben restarse entre s\u00ed para inventar un porcentaje de ahorro.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Tema<\/th><th>Dato publicado<\/th><th>Fuente y fecha<\/th><th>Alcance y l\u00edmite<\/th><\/tr><\/thead><tbody><tr><td>Electricidad en EE. UU.<\/td><td>Promedio nacional a clientes industriales: 8,51 centavos de d\u00f3lar por kWh en 2025; 9,09 centavos en el acumulado a agosto de 2026 (dato preliminar).<\/td><td>EIA, Electric Power Monthly, tabla 5.3<\/td><td>Es un promedio de todo el pa\u00eds, no la tarifa de un centro de datos concreto. Los precios var\u00edan mucho entre estados.<\/td><\/tr><tr><td>Electricidad en el Per\u00fa<\/td><td>No hay una serie oficial comparable a la de la EIA para el precio final que pagar\u00eda un centro de datos. Los precios en barra de Osinergmin son una referencia mayorista, no la factura de un usuario libre.<\/td><td>Osinergmin, Informe T\u00e9cnico 130-2026-GRT, febrero de 2026<\/td><td>Un campus grande suele negociar su suministro como usuario libre. Convertir el precio en barra a d\u00f3lares y compararlo con el promedio de la EIA no ser\u00eda un c\u00e1lculo riguroso.<\/td><\/tr><tr><td>Construcci\u00f3n en mercados de EE. UU.<\/td><td>Dallas, 10,51 d\u00f3lares por watt; norte de Virginia, 11,80; Silicon Valley, 15,01. El \u00edndice usa un dise\u00f1o t\u00edpico de 60 MW.<\/td><td>Turner y Townsend, \u00edndice 2026-2027, citado por El Economista (9 nov. 2026)<\/td><td>El \u00edndice no incluye al Per\u00fa. Seg\u00fan la consultora, la cifra no cubre el terreno, las obras de conexi\u00f3n el\u00e9ctrica ni los equipos de TI.<\/td><\/tr><tr><td>Construcci\u00f3n en el Per\u00fa<\/td><td>Entre 6,5 y 7,5 millones de d\u00f3lares por MW en 2025 (equivalente a 6,50 a 7,50 d\u00f3lares por watt), frente a 8 a 10 millones en varios mercados vecinos de Am\u00e9rica Latina.<\/td><td>Arizton Advisory, citado por Gesti\u00f3n<\/td><td>Compara al Per\u00fa con la regi\u00f3n, no con Estados Unidos, y no usa la misma metodolog\u00eda que Turner y Townsend.<\/td><\/tr><tr><td>Ahorro de estos planes de EE. UU.<\/td><td>No se encontr\u00f3 una cifra oficial ni un c\u00e1lculo de un medio o consultora seria atribuible a este memorando.<\/td><td>B\u00fasqueda de comunicados de la PCM, la Embajada, el Departamento de Estado y la prensa seria, nov. 2026<\/td><td>Tampoco se encontr\u00f3 un indicador comparable de mano de obra, ni una ley peruana de incentivos espec\u00edfica para centros de datos ligada a este acuerdo.<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\">Cifras p\u00fablicas de costo. No son un ahorro calculado para el memorando de septiembre de 2026.<\/figcaption><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Hay contrapartidas que tampoco aparecen en el memorando. La misma Agencia Internacional de la Energ\u00eda advierte de un dilema t\u00e9cnico: el enfriamiento que ahorra agua suele consumir m\u00e1s electricidad, y al rev\u00e9s. Estima, adem\u00e1s, que cerca del 40% de la capacidad identificada de centros de datos dedicados a la IA est\u00e1 en zonas de estr\u00e9s h\u00eddrico alto o muy alto. En el Per\u00fa, seg\u00fan cifras preliminares del <a href=\"https:\/\/www.gob.pe\/institucion\/minem\/informes-publicaciones\/6912321-principales-indicadores-del-subsector-electrico-2025-a-nivel-nacional\">Ministerio de Energ\u00eda y Minas<\/a> para 2025, basadas en el COES, la producci\u00f3n nacional fue de 65.109 GWh: la hidroel\u00e9ctrica aport\u00f3 33.996 GWh, alrededor del 52%, y el gas natural 22.879 GWh, alrededor del 35%. La hidr\u00e1ulica depende de las lluvias, y un centro de datos necesita electricidad continua. Eso no demuestra que el Per\u00fa sea m\u00e1s barato ni m\u00e1s caro que Estados Unidos; s\u00ed muestra que el costo no es el \u00fanico factor, y que el agua y la red importan tanto como el precio del kilovatio.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">El agua: c\u00f3mo se usa, y las quejas en Estados Unidos<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">El memorando peruano no dedica una l\u00ednea al agua. En Estados Unidos, el debate ya es p\u00fablico y local, con cifras oficiales, reportes de empresa y protestas vecinales. No todos los centros de datos consumen la misma cantidad: depende del sistema de enfriamiento, del clima y de si se cuenta solo el agua que se usa en el predio o tambi\u00e9n la que se gasta para generar la electricidad.<\/p>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>Explicado f\u00e1cil: c\u00f3mo se enfr\u00eda un centro de datos<\/summary>\n<p class=\"wp-block-paragraph\">Los servidores generan calor las 24 horas. Una forma habitual de disiparlo es el enfriamiento evaporativo: se usa agua, una parte se evapora y esa p\u00e9rdida hay que reponerla. Otra opci\u00f3n es el enfriamiento por aire o con condensadores secos, que gasta poca agua y, en muchos casos, m\u00e1s electricidad. Por eso un mismo campus puede tener un consumo h\u00eddrico muy distinto seg\u00fan la tecnolog\u00eda. La m\u00e9trica habitual es la WUE, litros de agua por kilovatio hora de los equipos. El informe de Berkeley, respaldado por el Departamento de Energ\u00eda de EE. UU., sit\u00faa el promedio estadounidense de WUE en el predio justo por encima de 0,36 litros por kWh hasta 2023.<\/p>\n\n<\/details>\n\n\n\n<p class=\"wp-block-paragraph\">The <a href=\"https:\/\/eta-publications.lbl.gov\/sites\/default\/files\/2024-12\/lbnl-2024-united-states-data-center-energy-usage-report_1.pdf\">informe de 2024 del Lawrence Berkeley National Laboratory<\/a> (Shehabi y otros, diciembre de 2024) estima que los centros de datos de Estados Unidos usaron de forma directa, en el sitio, 21.200 millones de litros de agua en 2014 y 66.000 millones en 2023, el 84% de esa cifra de 2023 en centros de hiperescala y de colocaci\u00f3n. El agua indirecta, asociada a los 176 TWh que consumieron en 2023, se acerca a 800.000 millones de litros, y para 2028 solo los de hiperescala podr\u00edan situarse entre 60.000 y 124.000 millones, seg\u00fan las decisiones de enfriamiento; son estimaciones nacionales, no la factura de un solo predio.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" src=\"https:\/\/pasalavoz.net\/wp-content\/uploads\/2026\/11\/peru-dc-agua-eeuu-es.png\" alt=\"Gr\u00e1fico de barras: uso directo de agua de los centros de datos en Estados Unidos, 21.200 millones de litros en 2014 y 66.000 millones en 2023. Fuente: Lawrence Berkeley National Laboratory, 2024.\"\/><figcaption class=\"wp-element-caption\">Uso directo de agua, en el predio, de los centros de datos de EE. UU. No incluye el agua usada para generar la electricidad. Fuente: Shehabi y otros, Lawrence Berkeley National Laboratory, informe de 2024 respaldado por el Departamento de Energ\u00eda.<\/figcaption><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">En The Dalles, Oreg\u00f3n, <a href=\"https:\/\/www.oregonlive.com\/silicon-forest\/2026\/04\/more-oregon-water-for-googles-data-centers-more-concern-over-secrecy.html\">The Oregonian<\/a> inform\u00f3 en abril de 2026 de que los centros de datos de Google usaron all\u00ed casi 550 millones de galones de agua en 2025, cerca del 40% del consumo de la ciudad.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">En Mesa, Arizona, <a href=\"https:\/\/www.theguardian.com\/environment\/2025\/apr\/09\/big-tech-datacentres-water\">The Guardian<\/a> relat\u00f3 en abril de 2025 que el primer centro de Google tiene un permiso para 5,5 millones de metros c\u00fabicos de agua al a\u00f1o, en el condado de Maricopa, entonces en \u00absequ\u00eda extrema\u00bb seg\u00fan la NOAA.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">En Amarillo, Texas, <a href=\"https:\/\/www.texastribune.org\/2025\/10\/02\/rural-texas-data-centers-water\/\">The Texas Tribune<\/a> inform\u00f3 el 2 de octubre de 2025 de protestas contra un acuerdo de agua con Fermi America para un campus de gran escala, por la presi\u00f3n sobre el acu\u00edfero Ogallala; el estado no exige a la mayor\u00eda de estos centros que reporten su consumo.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El informe ambiental de Google de 2025 dice que en 2024 consumi\u00f3 unos 8.100 millones de galones (31.000 millones de litros) en el conjunto de sus centros de datos propios, excluidos los de terceros, y sus oficinas: es una cifra combinada, no solo de centros de datos, y subi\u00f3 28% respecto de 2023. En el mismo reporte, la compa\u00f1\u00eda afirma que opt\u00f3 por enfriamiento por aire en Waltham Cross (Reino Unido), Mesa (Arizona) y Canelones (Uruguay).<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">En Am\u00e9rica Latina ya hay precedentes. En Cerrillos, Chile, y en Canelones, Uruguay, proyectos de Google enfrentaron oposici\u00f3n por el agua y fueron reformulados con enfriamiento por aire, seg\u00fan <a href=\"https:\/\/www.reuters.com\/technology\/google-takes-chile-data-center-plans-back-square-one-environmental-concerns-2024-09-17\/\">Reuters<\/a> (17 de septiembre de 2024) y <a href=\"https:\/\/www.theguardian.com\/world\/2023\/jul\/11\/uruguay-drought-water-google-data-center\">The Guardian<\/a>; el detalle est\u00e1 en la tabla.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Lugar<\/th><th>Qu\u00e9 se document\u00f3<\/th><th>Qu\u00e9 se sabe del desenlace<\/th><th>Source<\/th><\/tr><\/thead><tbody><tr><td>The Dalles, Oreg\u00f3n<\/td><td>Casi 550 millones de galones de agua de Google en 2025, cerca del 40% del consumo de la ciudad.<\/td><td>El municipio alega confidencialidad sobre la demanda futura; hay oposici\u00f3n a ceder terreno federal para ampliar la presa de Crow Creek, por un mayor retiro del r\u00edo Dog.<\/td><td>The Oregonian, abril de 2026<\/td><\/tr><tr><td>Mesa, Arizona<\/td><td>Permiso de 5,5 millones de metros c\u00fabicos al a\u00f1o en el primer centro de Google, un volumen que The Guardian compar\u00f3 con el uso de unos 23.000 residentes t\u00edpicos de Arizona, en el condado de Maricopa entonces en sequ\u00eda extrema (NOAA).<\/td><td>Hubo objeciones vecinales; Google afirma luego que opt\u00f3 por enfriamiento por aire en Mesa.<\/td><td>The Guardian, abril de 2025; informe ambiental de Google, 2025<\/td><\/tr><tr><td>Amarillo, Texas<\/td><td>Protestas contra un acuerdo de agua con Fermi America para un campus de gran escala, por la presi\u00f3n sobre el acu\u00edfero Ogallala.<\/td><td>El estado no exige a la mayor\u00eda de estos centros que reporten su consumo.<\/td><td>The Texas Tribune, 2 oct. 2025<\/td><\/tr><tr><td>Condado de Loudoun, Virginia<\/td><td>El condado publica una <a href=\"https:\/\/www.loudoun.gov\/6402\/Water-Considerations\">p\u00e1gina oficial<\/a> sobre el uso de agua en centros de datos.<\/td><td>Es informaci\u00f3n institucional p\u00fablica, no un conflicto puntual descrito aqu\u00ed.<\/td><td>Condado de Loudoun<\/td><\/tr><tr><td>Cerrillos, Chile<\/td><td>Oposici\u00f3n vecinal (Mosacat) al uso de agua subterr\u00e1nea en plena sequ\u00eda; en 2024 el Segundo Tribunal Ambiental concluy\u00f3 que la evaluaci\u00f3n no hab\u00eda tratado de forma adecuada el impacto sobre el acu\u00edfero de Santiago y el cambio clim\u00e1tico.<\/td><td>Google retir\u00f3 el permiso original y anunci\u00f3 una reformulaci\u00f3n con enfriamiento por aire.<\/td><td>Reuters, 17 sept. 2024<\/td><\/tr><tr><td>Canelones, Uruguay<\/td><td>El plan original, 7,6 millones de litros de agua potable al d\u00eda (el uso dom\u00e9stico aproximado de 55.000 personas), en plena sequ\u00eda, seg\u00fan cifras del Ministerio de Ambiente obtenidas por Daniel Pe\u00f1a.<\/td><td>Se redise\u00f1\u00f3 con enfriamiento por aire y se aprob\u00f3 en 2024.<\/td><td>The Guardian, 2023 y 2024<\/td><\/tr><tr><td>Lima, Per\u00fa<\/td><td>El memorando de IA no menciona el agua. No hay un anuncio de campus estadounidense ligado al acuerdo.<\/td><td>La Defensor\u00eda advierte estr\u00e9s h\u00eddrico y ausencia de reglas ambientales espec\u00edficas para el sector.<\/td><td>PCM, 8 sept. 2026; Defensor\u00eda, 17 jul. 2026<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\">Casos documentados. Las cifras no son equivalentes entre s\u00ed: unas son consumo medido, otras un permiso o un plan original, luego modificado.<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Qu\u00e9 hay, y qu\u00e9 falta, en el Per\u00fa<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Lima es, seg\u00fan un informe de la <a href=\"https:\/\/cdn.www.gob.pe\/uploads\/document\/file\/9416958\/7715654-informe-consumo-de-agua-en-lima-y-callao.pdf\">Superintendencia Nacional de Servicios de Saneamiento (SUNASS)<\/a>, la segunda ciudad m\u00e1s poblada del mundo construida en un desierto. El regulador la sit\u00faa, con buena parte de la costa, en un riesgo muy grave de estr\u00e9s h\u00eddrico, citando al World Resources Institute (2023). Depende de trasvases andinos, embalses y acu\u00edferos, y cita una estimaci\u00f3n de AQUAFONDO (2020) de que la disponibilidad podr\u00eda caer un 30% en 10 a 15 a\u00f1os. En 2025, el consumo promedio en Lima y Callao se estim\u00f3 en 134 litros por persona al d\u00eda; solo 19 de 46 distritos analizados ten\u00edan servicio las 24 horas.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La <a href=\"https:\/\/www.defensoria.gob.pe\/wp-content\/uploads\/2026\/07\/NP-382-2026-DP.pdf\">Defensor\u00eda del Pueblo<\/a> advirti\u00f3 el 17 de julio de 2026 que alrededor del 80% de estas instalaciones est\u00e1 en Lima, que describi\u00f3 la capacidad operativa de 12 MW en la capital como ya saturada, y que el valle de Lur\u00edn se consolida como el principal cl\u00faster de gran escala. Esa expansi\u00f3n, dijo, ocurre \u00absobre una ciudad con estr\u00e9s h\u00eddrico cr\u00f3nico, donde el 57% del agua azul disponible se agota de forma irrecuperable cada a\u00f1o\u00bb. El sector, a\u00f1adi\u00f3, opera sin una regulaci\u00f3n ambiental propia: no hay permisos sectoriales ni est\u00e1ndares obligatorios de eficiencia energ\u00e9tica o h\u00eddrica, y los centros de datos no figuran de forma expresa entre los proyectos que deben pasar por el Sistema Nacional de Evaluaci\u00f3n del Impacto Ambiental. Tampoco existe, dijo, un estudio oficial o acad\u00e9mico peruano que haya medido el consumo de agua y energ\u00eda del sector en conjunto. Record\u00f3 que la Ley de Recursos H\u00eddricos (Ley 29338, art\u00edculo 35) prioriza el uso poblacional del agua sobre el uso productivo o industrial.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Meses antes, el 11 de marzo de 2026, <a href=\"https:\/\/laencerrona.pe\/2026\/03\/11\/la-industria-de-los-centros-de-datos-en-peru-crece-sin-regulacion-ni-control-ambiental\/\">La Encerrona<\/a> hab\u00eda publicado que la ANA, consultada, no ten\u00eda registro de autorizaciones de uso de agua otorgadas a empresas de centros de datos; que el Minam dec\u00eda no tener un plan nacional para el sector; y que el OEFA indicaba que la actividad no figuraba entre las categor\u00edas bajo su supervisi\u00f3n. OjoP\u00fablico, al revelar el memorando en noviembre, cruz\u00f3 ese vac\u00edo regulatorio con lo que el acuerdo s\u00ed promueve: m\u00e1s infraestructura digital, incluidos centros de datos.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" src=\"https:\/\/pasalavoz.net\/wp-content\/uploads\/2026\/11\/peru-dc-cronologia-es.png\" alt=\"Cronolog\u00eda de 2026: en marzo, La Encerrona informa que la ANA no registra permisos de agua para centros de datos; en julio, la Defensor\u00eda advierte la falta de reglas; el 8 de septiembre se firma el memorando de IA; el 3 de noviembre, un memorando nuclear distinto; el 8 de noviembre, OjoP\u00fablico publica el texto del acuerdo de IA.\"\/><figcaption class=\"wp-element-caption\">Hechos de 2026, en orden. El memorando nuclear del 3 de noviembre es un acuerdo distinto, no una cl\u00e1usula del de inteligencia artificial. Fuentes: La Encerrona, Defensor\u00eda, PCM, Canciller\u00eda, OjoP\u00fablico.<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Un segundo acuerdo, el de energ\u00eda nuclear, es otra cosa<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">El 3 de noviembre de 2026, el Per\u00fa y Estados Unidos firmaron en Lima un <a href=\"https:\/\/www.gob.pe\/institucion\/rree\/noticias\/1468569-peru-y-estados-unidos-suscriben-memorandum-de-entendimiento-sobre-cooperacion-nuclear-civil-estrategica\">Memor\u00e1ndum de Entendimiento sobre Cooperaci\u00f3n Nuclear Civil Estrat\u00e9gica<\/a>, entre el ministro de Energ\u00eda y Minas, Guillermo Shinno, y el subsecretario de Estado Thomas G. DiNanno. La Canciller\u00eda lo presenta como cooperaci\u00f3n t\u00e9cnica para usos pac\u00edficos y para evaluar reactores modulares peque\u00f1os. El programa estadounidense FIRST aportar\u00e1 un mill\u00f3n de d\u00f3lares en asistencia t\u00e9cnica. El texto oficial no menciona centros de datos. En una entrevista con <a href=\"https:\/\/gestion.pe\/economia\/energia-nuclear-estados-unidos-busca-invertir-en-data-centers-puertos-y-minas-en-peru-noticia\/\">Gesti\u00f3n<\/a> del 11 de noviembre, DiNanno dijo que posibles usos de nicho \u00abpueden ser data centers, puertos, bases militares y minas\u00bb, y Navarro afirm\u00f3 que \u00abla red el\u00e9ctrica en Lima, por ejemplo, la dirige un pa\u00eds fuera del hemisferio\u00bb. Son comentarios de funcionarios sobre un acuerdo distinto, no cl\u00e1usulas del memorando de septiembre.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Qu\u00e9 hay que vigilar<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Tres hechos, si ocurren, cambiar\u00edan el cuadro: que el Gobierno publique el texto \u00edntegro del memorando de IA; que una empresa estadounidense anuncie un centro de datos o una regi\u00f3n de nube en el Per\u00fa, con cifras de agua y de electricidad; y que aparezcan reglas ambientales y de eficiencia h\u00eddrica espec\u00edficas para el sector, o que estos proyectos entren de forma expresa al sistema de evaluaci\u00f3n de impacto ambiental. Hasta entonces, lo firmado es un marco de cooperaci\u00f3n y de negocios, no una autorizaci\u00f3n, y la pregunta del agua en Lima sigue sin respuesta en el propio acuerdo. El tablero m\u00e1s amplio de chips, reglas de exportaci\u00f3n y la competencia entre Estados Unidos y China est\u00e1 en el <a href=\"https:\/\/pasalavoz.net\/en\/nvidia-jensen-huang-us-china-chess-explained\/\">art\u00edculo de Nvidia<\/a>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Esa posibilidad de una inversi\u00f3n estadounidense en centros de datos en el Per\u00fa tambi\u00e9n hay que leerla junto con lo que dijo Trump el 20 de noviembre de 2026. En una rueda de prensa en la Casa Blanca amenaz\u00f3 con un \u00abimpuesto tremendo\u00bb a las empresas estadounidenses que construyan centros de datos fuera del pa\u00eds, \u00abporque China se los quedar\u00e1 todos\u00bb. No dio detalles sobre c\u00f3mo se aplicar\u00eda y dijo que a\u00fan no lo hab\u00eda hablado con su equipo (<a href=\"https:\/\/www.investing.com\/news\/world-news\/trump-says-us-to-penalize-firms-building-data-centers-abroad-5042390\">Reuters<\/a>, <a href=\"https:\/\/apnews.com\/article\/trump-artificial-intelligence-data-centers-f1ac03b73d13445400eeed8631d9d879\">AP<\/a>, <a href=\"https:\/\/www.bbc.com\/news\/articles\/cmde1lw9y54ko\">BBC<\/a>). No es todav\u00eda una pol\u00edtica definida. Reuters, AP y BBC no mencionan al Per\u00fa, y no se ha anunciado ninguna medida concreta que afecte a los proveedores de nube que ya operan en el pa\u00eds: es una conexi\u00f3n nuestra, a partir de lo que este art\u00edculo documenta.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Sources<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>PCM: <a href=\"https:\/\/www.gob.pe\/institucion\/pcm\/noticias\/1441161-pcm-y-embajada-de-los-estados-unidos-suscriben-memorando-de-entendimiento-para-impulsar-desarrollo-la-ia-en-el-peru\" target=\"_blank\" rel=\"noopener\">\u00abPCM y Embajada de los Estados Unidos suscriben memorando de entendimiento para impulsar desarrollo la IA en el Per\u00fa\u00bb<\/a>, 8 sept. 2026<\/li>\n\n\n<li>Embajada de EE. UU. en el Per\u00fa: <a href=\"https:\/\/pe.usembassy.gov\/es\/embajador-navarro-lidero-cumbre-de-inteligencia-artificial-para-impulsar-el-futuro-digital-del-peru\/\" target=\"_blank\" rel=\"noopener\">\u00abEmbajador Navarro lider\u00f3 cumbre de inteligencia artificial para impulsar el futuro digital del Per\u00fa\u00bb<\/a>, 8 sept. 2026<\/li>\n\n\n<li>Andina: <a href=\"https:\/\/andina.pe\/agencia\/noticia-peru-government-and-us-embassy-sign-mou-to-boost-ai-development-1090931.aspx\" target=\"_blank\" rel=\"noopener\">\u00abPeru: Government and U.S. Embassy sign MOU to boost AI development\u00bb<\/a>, 8 sept. 2026<\/li>\n\n\n<li>EFE, v\u00eda Swissinfo: <a href=\"https:\/\/www.swissinfo.ch\/spa\/per%C3%BA-firma-memorando-para-importar-y-adoptar-ia-de-ee.uu.-frente-a-otros-pa%C3%ADses-como-china\/92032754\" target=\"_blank\" rel=\"noopener\">\u00abPer\u00fa firma memorando para importar y adoptar IA de EE.UU. frente a otros pa\u00edses como China\u00bb<\/a>, 9 sept. 2026<\/li>\n\n\n<li>OjoP\u00fablico: <a href=\"https:\/\/ojo-publico.com\/6578\/memorandum-ia-eeuu-busca-construir-mas-centros-datos-peru\" target=\"_blank\" rel=\"noopener\">\u00abMemor\u00e1ndum de IA con Estados Unidos plantea construir m\u00e1s centros de datos en Per\u00fa\u00bb<\/a>, 8 nov. 2026<\/li>\n\n\n<li>Marco Rubio, en El Comercio: <a href=\"https:\/\/elcomercio.pe\/opinion\/columnistas\/un-hemisferio-que-cumple-por-marco-rubio-noticia\/\" target=\"_blank\" rel=\"noopener\">\u00abUn hemisferio que cumple\u00bb<\/a>, 8 sept. 2026<\/li>\n\n\n<li>EFE, v\u00eda Swissinfo: <a href=\"https:\/\/www.swissinfo.ch\/spa\/china-responde-a-marco-rubio%3A-%22inversi%C3%B3n-china-en-per%C3%BA-es-transparente-y-acorde-a-la-ley%22\/92026119\" target=\"_blank\" rel=\"noopener\">\u00abChina responde a Marco Rubio: inversi\u00f3n china en Per\u00fa es transparente y acorde a la ley\u00bb<\/a>, 9 sept. 2026<\/li>\n\n\n<li>Canciller\u00eda del Per\u00fa: <a href=\"https:\/\/www.gob.pe\/institucion\/rree\/noticias\/1468569-peru-y-estados-unidos-suscriben-memorandum-de-entendimiento-sobre-cooperacion-nuclear-civil-estrategica\" target=\"_blank\" rel=\"noopener\">\u00abPer\u00fa y Estados Unidos suscriben Memor\u00e1ndum de Entendimiento sobre Cooperaci\u00f3n Nuclear Civil Estrat\u00e9gica\u00bb<\/a>, 3 nov. 2026<\/li>\n\n\n<li>Canciller\u00eda del Per\u00fa: <a href=\"https:\/\/www.gob.pe\/institucion\/rree\/noticias\/1347576-canciller-hugo-de-zela-suscribio-memorandum-de-entendimiento-sobre-minerales-criticos-en-washington-d-c\" target=\"_blank\" rel=\"noopener\">\u00abCanciller Hugo de Zela suscribi\u00f3 Memor\u00e1ndum de Entendimiento sobre minerales cr\u00edticos en Washington D.C.\u00bb<\/a>, 4 feb. 2026<\/li>\n\n\n<li>Gesti\u00f3n: <a href=\"https:\/\/gestion.pe\/economia\/energia-nuclear-estados-unidos-busca-invertir-en-data-centers-puertos-y-minas-en-peru-noticia\/\" target=\"_blank\" rel=\"noopener\">\u00abEnerg\u00eda nuclear: Estados Unidos busca invertir en data centers, puertos y minas en Per\u00fa\u00bb<\/a>, 11 nov. 2026<\/li>\n\n\n<li>Shehabi y otros, Lawrence Berkeley National Laboratory: <a href=\"https:\/\/eta-publications.lbl.gov\/sites\/default\/files\/2024-12\/lbnl-2024-united-states-data-center-energy-usage-report_1.pdf\" target=\"_blank\" rel=\"noopener\">\u00ab2024 United States Data Center Energy Usage Report\u00bb<\/a>, dic. 2024<\/li>\n\n\n<li>Agencia Internacional de la Energ\u00eda: <a href=\"https:\/\/www.iea.org\/reports\/powering-artificial-intelligence\" target=\"_blank\" rel=\"noopener\">\u00abPowering Artificial Intelligence\u00bb<\/a>, 14 oct. 2026<\/li>\n\n\n<li>U.S. Energy Information Administration: <a href=\"https:\/\/www.eia.gov\/electricity\/monthly\/epm_table_grapher.php?t=epmt_5_3\" target=\"_blank\" rel=\"noopener\">\u00abElectric Power Monthly, Table 5.3: Average Price of Electricity to Ultimate Customers\u00bb<\/a>, 2025-2026<\/li>\n\n\n<li>Osinergmin: <a href=\"https:\/\/cdn.www.gob.pe\/uploads\/document\/file\/9555590\/7820440-informe-tecnico-130-2026-grt.pdf\" target=\"_blank\" rel=\"noopener\">\u00abInforme T\u00e9cnico que sustenta la fijaci\u00f3n de Precios en Barra, periodo mayo 2026-abril 2027 (prepublicaci\u00f3n)\u00bb<\/a>, feb. 2026<\/li>\n\n\n<li>Gesti\u00f3n, citando a Arizton: <a href=\"https:\/\/gestion.pe\/economia\/empresas\/data-centers-mercado-en-peru-crecera-a-us-378-millones-al-2031-las-razones-detras-noticia\/\" target=\"_blank\" rel=\"noopener\">\u00abData centers: mercado en Per\u00fa crecer\u00e1 a US$ 378 millones al 2031\u00bb<\/a><\/li>\n\n\n<li>El Economista (M\u00e9xico), citando a Turner y Townsend: <a href=\"https:\/\/www.eleconomista.com.mx\/tecnologia\/construir-centro-datos-monterrey-cuesta-18-dallas-20261109-842926.html\" target=\"_blank\" rel=\"noopener\">\u00abConstruir un centro de datos en Monterrey cuesta 18% m\u00e1s que en Dallas\u00bb<\/a>, 9 nov. 2026<\/li>\n\n\n<li>Ministerio de Energ\u00eda y Minas: <a href=\"https:\/\/www.gob.pe\/institucion\/minem\/informes-publicaciones\/6912321-principales-indicadores-del-subsector-electrico-2025-a-nivel-nacional\" target=\"_blank\" rel=\"noopener\">\u00abPrincipales indicadores del subsector el\u00e9ctrico 2025, a nivel nacional (cifras preliminares a diciembre)\u00bb<\/a>, 2026<\/li>\n\n\n<li>The Oregonian: <a href=\"https:\/\/www.oregonlive.com\/silicon-forest\/2026\/04\/more-oregon-water-for-googles-data-centers-more-concern-over-secrecy.html\" target=\"_blank\" rel=\"noopener\">\u00abGoogle&#8217;s data centers drink more Oregon water, bringing fresh concerns over secrecy\u00bb<\/a>, abr. 2026<\/li>\n\n\n<li>The Guardian: <a href=\"https:\/\/www.theguardian.com\/environment\/2025\/apr\/09\/big-tech-datacentres-water\" target=\"_blank\" rel=\"noopener\">\u00abRevealed: Big tech&#8217;s new datacentres will take water from the world&#8217;s driest areas\u00bb<\/a>, 9 abr. 2025<\/li>\n\n\n<li>The Texas Tribune: <a href=\"https:\/\/www.texastribune.org\/2025\/10\/02\/rural-texas-data-centers-water\/\" target=\"_blank\" rel=\"noopener\">\u00abRural Texas casting skeptical eye on data center openings\u00bb<\/a>, 2 oct. 2025<\/li>\n\n\n<li>Loudoun County, Virginia: <a href=\"https:\/\/www.loudoun.gov\/6402\/Water-Considerations\" target=\"_blank\" rel=\"noopener\">\u00abData Centers: Water Considerations\u00bb<\/a><\/li>\n\n\n<li>Google: <a href=\"https:\/\/www.gstatic.com\/gumdrop\/sustainability\/google-2025-environmental-report.pdf\" target=\"_blank\" rel=\"noopener\">\u00ab2025 Environmental Report\u00bb<\/a>, jun. 2025<\/li>\n\n\n<li>Reuters: <a href=\"https:\/\/www.reuters.com\/technology\/google-takes-chile-data-center-plans-back-square-one-environmental-concerns-2024-09-17\/\" target=\"_blank\" rel=\"noopener\">\u00abGoogle takes Chile data center plans back to square one on environmental concerns\u00bb<\/a>, 17 sept. 2024<\/li>\n\n\n<li>The Guardian: <a href=\"https:\/\/www.theguardian.com\/world\/2023\/jul\/11\/uruguay-drought-water-google-data-center\" target=\"_blank\" rel=\"noopener\">\u00abThirsty Uruguayans decry Google&#8217;s plan to use drinking-water supply\u00bb<\/a>, 11 jul. 2023<\/li>\n\n\n<li>The Guardian: <a href=\"https:\/\/www.theguardian.com\/global-development\/article\/2024\/aug\/01\/uruguay-anger-environmental-cost-google-datacentre-carbon-emissions-toxic-waste-water\" target=\"_blank\" rel=\"noopener\">\u00abAnger mounts over environmental cost of Google datacentre in Uruguay\u00bb<\/a>, 1 ago. 2024<\/li>\n\n\n<li>SUNASS: <a href=\"https:\/\/cdn.www.gob.pe\/uploads\/document\/file\/9416958\/7715654-informe-consumo-de-agua-en-lima-y-callao.pdf\" target=\"_blank\" rel=\"noopener\">\u00abVivir en el desierto: cu\u00e1nta agua consumimos y qu\u00e9 calidad de servicio tenemos en Lima Metropolitana y Callao\u00bb<\/a>, 2026<\/li>\n\n\n<li>Defensor\u00eda del Pueblo: <a href=\"https:\/\/www.defensoria.gob.pe\/wp-content\/uploads\/2026\/07\/NP-382-2026-DP.pdf\" target=\"_blank\" rel=\"noopener\">\u00abNota de prensa 382\/OGCO\/DP\/2026: mesa de trabajo sobre infraestructura digital, inteligencia artificial y sostenibilidad ambiental\u00bb<\/a>, 17 jul. 2026<\/li>\n\n\n<li>La Encerrona: <a href=\"https:\/\/laencerrona.pe\/2026\/03\/11\/la-industria-de-los-centros-de-datos-en-peru-crece-sin-regulacion-ni-control-ambiental\/\" target=\"_blank\" rel=\"noopener\">\u00abLa industria de los centros de datos en Per\u00fa crece sin regulaci\u00f3n ni control ambiental\u00bb<\/a>, 11 mar. 2026<\/li>\n\n\n<li>AWS: <a href=\"https:\/\/aws.amazon.com\/about-aws\/whats-new\/2023\/01\/aws-local-zones-lagos-lima-queretaro\/\" target=\"_blank\" rel=\"noopener\">\u00abAnnouncing the general availability of AWS Local Zones in Lagos, Lima, and Quer\u00e9taro\u00bb<\/a>, 25 ene. 2023<\/li>\n\n\n<li>Reuters (v\u00eda Investing.com): <a href=\"https:\/\/www.investing.com\/news\/world-news\/trump-says-us-to-penalize-firms-building-data-centers-abroad-5042390\" target=\"_blank\" rel=\"noopener\">\u00abTrump says US to penalize firms building data centers abroad\u00bb<\/a>, 20 nov. 2026<\/li>\n\n\n<li>AP: <a href=\"https:\/\/apnews.com\/article\/trump-artificial-intelligence-data-centers-f1ac03b73d13445400eeed8631d9d879\" target=\"_blank\" rel=\"noopener\">\u00abUS tech companies that build AI data centers in other countries will be penalized, Trump says\u00bb<\/a>, 20 nov. 2026<\/li>\n\n\n<li>BBC: <a href=\"https:\/\/www.bbc.com\/news\/articles\/cmde1lw9y54ko\" target=\"_blank\" rel=\"noopener\">\u00abTrump threatens ban on US firms building AI data centres overseas\u00bb<\/a>, 20 nov. 2026<\/li>\n\n<\/ul>","protected":false},"excerpt":{"rendered":"<p>El 8 de septiembre de 2026, el Per\u00fa y Estados Unidos firmaron en Lima un memorando de entendimiento sobre inteligencia [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":347,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[12],"tags":[],"class_list":["post-351","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-explicado-en-espanol"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.9 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Centros de datos en el Per\u00fa y el agua - Pasa la Voz<\/title>\n<meta name=\"description\" content=\"Per\u00fa y EE. UU. firmaron un memorando de IA en septiembre: qu\u00e9 dice el texto, qu\u00e9 no cubre, y por qu\u00e9 el agua es la pregunta abierta, tambi\u00e9n en EE. UU.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/pasalavoz.net\/en\/centros-de-datos-peru-acuerdo-eeuu-agua\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Centros de datos en el Per\u00fa y el agua - Pasa la Voz\" \/>\n<meta property=\"og:description\" content=\"Per\u00fa y EE. UU. firmaron un memorando de IA en septiembre: qu\u00e9 dice el texto, qu\u00e9 no cubre, y por qu\u00e9 el agua es la pregunta abierta, tambi\u00e9n en EE. UU.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/pasalavoz.net\/en\/centros-de-datos-peru-acuerdo-eeuu-agua\/\" \/>\n<meta property=\"og:site_name\" content=\"Pasa la Voz\" \/>\n<meta property=\"article:published_time\" content=\"2026-11-20T23:44:17+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-11-20T23:44:18+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/pasalavoz.net\/wp-content\/uploads\/2026\/11\/peru-dc-social-es.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"630\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Javier Pezo\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Javier Pezo\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"20 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/pasalavoz.net\\\/centros-de-datos-peru-acuerdo-eeuu-agua\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/pasalavoz.net\\\/centros-de-datos-peru-acuerdo-eeuu-agua\\\/\"},\"author\":{\"name\":\"Javier Pezo\",\"@id\":\"https:\\\/\\\/pasalavoz.net\\\/#\\\/schema\\\/person\\\/5edf0a5fc55cbcf495f284fd9a708f48\"},\"headline\":\"\u00bfCentros de datos en el Per\u00fa? Lo que firm\u00f3 EE. UU. y la pregunta del agua\",\"datePublished\":\"2026-11-20T23:44:17+00:00\",\"dateModified\":\"2026-11-20T23:44:18+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/pasalavoz.net\\\/centros-de-datos-peru-acuerdo-eeuu-agua\\\/\"},\"wordCount\":4184,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/pasalavoz.net\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/pasalavoz.net\\\/centros-de-datos-peru-acuerdo-eeuu-agua\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/pasalavoz.net\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/peru-dc-card-es.jpg\",\"articleSection\":[\"Explicado en espa\u00f1ol\"],\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/pasalavoz.net\\\/centros-de-datos-peru-acuerdo-eeuu-agua\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/pasalavoz.net\\\/centros-de-datos-peru-acuerdo-eeuu-agua\\\/\",\"url\":\"https:\\\/\\\/pasalavoz.net\\\/centros-de-datos-peru-acuerdo-eeuu-agua\\\/\",\"name\":\"Centros de datos en el Per\u00fa y el agua - Pasa la Voz\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/pasalavoz.net\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/pasalavoz.net\\\/centros-de-datos-peru-acuerdo-eeuu-agua\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/pasalavoz.net\\\/centros-de-datos-peru-acuerdo-eeuu-agua\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/pasalavoz.net\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/peru-dc-card-es.jpg\",\"datePublished\":\"2026-11-20T23:44:17+00:00\",\"dateModified\":\"2026-11-20T23:44:18+00:00\",\"description\":\"Per\u00fa y EE. UU. firmaron un memorando de IA en septiembre: qu\u00e9 dice el texto, qu\u00e9 no cubre, y por qu\u00e9 el agua es la pregunta abierta, tambi\u00e9n en EE. UU.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/pasalavoz.net\\\/centros-de-datos-peru-acuerdo-eeuu-agua\\\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/pasalavoz.net\\\/centros-de-datos-peru-acuerdo-eeuu-agua\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/pasalavoz.net\\\/centros-de-datos-peru-acuerdo-eeuu-agua\\\/#primaryimage\",\"url\":\"https:\\\/\\\/pasalavoz.net\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/peru-dc-card-es.jpg\",\"contentUrl\":\"https:\\\/\\\/pasalavoz.net\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/peru-dc-card-es.jpg\",\"width\":1200,\"height\":675,\"caption\":\"Tarjeta de Pasa la Voz: \u00ab\u00bfCentros de datos en el Per\u00fa? Lo que firm\u00f3 EE. UU. y el agua\u00bb, con una l\u00ednea de 2026.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/pasalavoz.net\\\/centros-de-datos-peru-acuerdo-eeuu-agua\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/pasalavoz.net\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"\u00bfCentros de datos en el Per\u00fa? Lo que firm\u00f3 EE. UU. y la pregunta del agua\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/pasalavoz.net\\\/#website\",\"url\":\"https:\\\/\\\/pasalavoz.net\\\/\",\"name\":\"Pasa la Voz\",\"description\":\"Lo mejor del mundo, ahora en tu idioma\",\"publisher\":{\"@id\":\"https:\\\/\\\/pasalavoz.net\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/pasalavoz.net\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/pasalavoz.net\\\/#organization\",\"name\":\"Pasa la Voz\",\"url\":\"https:\\\/\\\/pasalavoz.net\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/pasalavoz.net\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/pasalavoz.net\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/pasalavoz-logo-531x240-1.png\",\"contentUrl\":\"https:\\\/\\\/pasalavoz.net\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/pasalavoz-logo-531x240-1.png\",\"width\":531,\"height\":240,\"caption\":\"Pasa la Voz\"},\"image\":{\"@id\":\"https:\\\/\\\/pasalavoz.net\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/pasalavoz.net\\\/#\\\/schema\\\/person\\\/5edf0a5fc55cbcf495f284fd9a708f48\",\"name\":\"Javier Pezo\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/33c2d1f60b37185b8a9c302284c5ded73ef64782af6575333aecf0d407dd2ec9?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/33c2d1f60b37185b8a9c302284c5ded73ef64782af6575333aecf0d407dd2ec9?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/33c2d1f60b37185b8a9c302284c5ded73ef64782af6575333aecf0d407dd2ec9?s=96&d=mm&r=g\",\"caption\":\"Javier Pezo\"},\"sameAs\":[\"https:\\\/\\\/pasalavoz.net\"],\"url\":\"https:\\\/\\\/pasalavoz.net\\\/en\\\/author\\\/javier-pezo\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Centros de datos en el Per\u00fa y el agua - Pasa la Voz","description":"Per\u00fa y EE. UU. firmaron un memorando de IA en septiembre: qu\u00e9 dice el texto, qu\u00e9 no cubre, y por qu\u00e9 el agua es la pregunta abierta, tambi\u00e9n en EE. UU.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/pasalavoz.net\/en\/centros-de-datos-peru-acuerdo-eeuu-agua\/","og_locale":"en_GB","og_type":"article","og_title":"Centros de datos en el Per\u00fa y el agua - Pasa la Voz","og_description":"Per\u00fa y EE. UU. firmaron un memorando de IA en septiembre: qu\u00e9 dice el texto, qu\u00e9 no cubre, y por qu\u00e9 el agua es la pregunta abierta, tambi\u00e9n en EE. UU.","og_url":"https:\/\/pasalavoz.net\/en\/centros-de-datos-peru-acuerdo-eeuu-agua\/","og_site_name":"Pasa la Voz","article_published_time":"2026-11-20T23:44:17+00:00","article_modified_time":"2026-11-20T23:44:18+00:00","og_image":[{"width":1200,"height":630,"url":"https:\/\/pasalavoz.net\/wp-content\/uploads\/2026\/11\/peru-dc-social-es.jpg","type":"image\/jpeg"}],"author":"Javier Pezo","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Javier Pezo","Estimated reading time":"20 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/pasalavoz.net\/centros-de-datos-peru-acuerdo-eeuu-agua\/#article","isPartOf":{"@id":"https:\/\/pasalavoz.net\/centros-de-datos-peru-acuerdo-eeuu-agua\/"},"author":{"name":"Javier Pezo","@id":"https:\/\/pasalavoz.net\/#\/schema\/person\/5edf0a5fc55cbcf495f284fd9a708f48"},"headline":"\u00bfCentros de datos en el Per\u00fa? Lo que firm\u00f3 EE. UU. y la pregunta del agua","datePublished":"2026-11-20T23:44:17+00:00","dateModified":"2026-11-20T23:44:18+00:00","mainEntityOfPage":{"@id":"https:\/\/pasalavoz.net\/centros-de-datos-peru-acuerdo-eeuu-agua\/"},"wordCount":4184,"commentCount":0,"publisher":{"@id":"https:\/\/pasalavoz.net\/#organization"},"image":{"@id":"https:\/\/pasalavoz.net\/centros-de-datos-peru-acuerdo-eeuu-agua\/#primaryimage"},"thumbnailUrl":"https:\/\/pasalavoz.net\/wp-content\/uploads\/2026\/11\/peru-dc-card-es.jpg","articleSection":["Explicado en espa\u00f1ol"],"inLanguage":"en-GB","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/pasalavoz.net\/centros-de-datos-peru-acuerdo-eeuu-agua\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/pasalavoz.net\/centros-de-datos-peru-acuerdo-eeuu-agua\/","url":"https:\/\/pasalavoz.net\/centros-de-datos-peru-acuerdo-eeuu-agua\/","name":"Centros de datos en el Per\u00fa y el agua - Pasa la Voz","isPartOf":{"@id":"https:\/\/pasalavoz.net\/#website"},"primaryImageOfPage":{"@id":"https:\/\/pasalavoz.net\/centros-de-datos-peru-acuerdo-eeuu-agua\/#primaryimage"},"image":{"@id":"https:\/\/pasalavoz.net\/centros-de-datos-peru-acuerdo-eeuu-agua\/#primaryimage"},"thumbnailUrl":"https:\/\/pasalavoz.net\/wp-content\/uploads\/2026\/11\/peru-dc-card-es.jpg","datePublished":"2026-11-20T23:44:17+00:00","dateModified":"2026-11-20T23:44:18+00:00","description":"Per\u00fa y EE. UU. firmaron un memorando de IA en septiembre: qu\u00e9 dice el texto, qu\u00e9 no cubre, y por qu\u00e9 el agua es la pregunta abierta, tambi\u00e9n en EE. UU.","breadcrumb":{"@id":"https:\/\/pasalavoz.net\/centros-de-datos-peru-acuerdo-eeuu-agua\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/pasalavoz.net\/centros-de-datos-peru-acuerdo-eeuu-agua\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/pasalavoz.net\/centros-de-datos-peru-acuerdo-eeuu-agua\/#primaryimage","url":"https:\/\/pasalavoz.net\/wp-content\/uploads\/2026\/11\/peru-dc-card-es.jpg","contentUrl":"https:\/\/pasalavoz.net\/wp-content\/uploads\/2026\/11\/peru-dc-card-es.jpg","width":1200,"height":675,"caption":"Tarjeta de Pasa la Voz: \u00ab\u00bfCentros de datos en el Per\u00fa? Lo que firm\u00f3 EE. UU. y el agua\u00bb, con una l\u00ednea de 2026."},{"@type":"BreadcrumbList","@id":"https:\/\/pasalavoz.net\/centros-de-datos-peru-acuerdo-eeuu-agua\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/pasalavoz.net\/"},{"@type":"ListItem","position":2,"name":"\u00bfCentros de datos en el Per\u00fa? Lo que firm\u00f3 EE. UU. y la pregunta del agua"}]},{"@type":"WebSite","@id":"https:\/\/pasalavoz.net\/#website","url":"https:\/\/pasalavoz.net\/","name":"Pasa la Voz","description":"Lo mejor del mundo, ahora en tu idioma","publisher":{"@id":"https:\/\/pasalavoz.net\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/pasalavoz.net\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Organization","@id":"https:\/\/pasalavoz.net\/#organization","name":"Pasa la Voz","url":"https:\/\/pasalavoz.net\/","logo":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/pasalavoz.net\/#\/schema\/logo\/image\/","url":"https:\/\/pasalavoz.net\/wp-content\/uploads\/2026\/11\/pasalavoz-logo-531x240-1.png","contentUrl":"https:\/\/pasalavoz.net\/wp-content\/uploads\/2026\/11\/pasalavoz-logo-531x240-1.png","width":531,"height":240,"caption":"Pasa la Voz"},"image":{"@id":"https:\/\/pasalavoz.net\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/pasalavoz.net\/#\/schema\/person\/5edf0a5fc55cbcf495f284fd9a708f48","name":"Javier Pezo","image":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/secure.gravatar.com\/avatar\/33c2d1f60b37185b8a9c302284c5ded73ef64782af6575333aecf0d407dd2ec9?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/33c2d1f60b37185b8a9c302284c5ded73ef64782af6575333aecf0d407dd2ec9?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/33c2d1f60b37185b8a9c302284c5ded73ef64782af6575333aecf0d407dd2ec9?s=96&d=mm&r=g","caption":"Javier Pezo"},"sameAs":["https:\/\/pasalavoz.net"],"url":"https:\/\/pasalavoz.net\/en\/author\/javier-pezo\/"}]}},"_links":{"self":[{"href":"https:\/\/pasalavoz.net\/en\/wp-json\/wp\/v2\/posts\/351","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pasalavoz.net\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/pasalavoz.net\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/pasalavoz.net\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/pasalavoz.net\/en\/wp-json\/wp\/v2\/comments?post=351"}],"version-history":[{"count":2,"href":"https:\/\/pasalavoz.net\/en\/wp-json\/wp\/v2\/posts\/351\/revisions"}],"predecessor-version":[{"id":372,"href":"https:\/\/pasalavoz.net\/en\/wp-json\/wp\/v2\/posts\/351\/revisions\/372"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pasalavoz.net\/en\/wp-json\/wp\/v2\/media\/347"}],"wp:attachment":[{"href":"https:\/\/pasalavoz.net\/en\/wp-json\/wp\/v2\/media?parent=351"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/pasalavoz.net\/en\/wp-json\/wp\/v2\/categories?post=351"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/pasalavoz.net\/en\/wp-json\/wp\/v2\/tags?post=351"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}